The process starts with review of the client or architect project and continues through structural engineering, factory production, delivery and on-site assembly.

ZTC experience and production facts

35+

years of experience

400+

completed projects

14

European countries

±1 mm

CNC precision

Timber house construction steps

Scheduling and manufacturing depend on current production capacity and project readiness. Factory manufacturing may begin from approximately two weeks for suitable scopes; assembly can be approximately 3–5 days per floor; the total programme depends on design, scope, logistics and site readiness.

  1. Step 1

    Project review

    ZTC reviews the architect or client project, scope and technical requirements.

    Depends on project readiness

  2. Step 2

    Structural solution and quotation

    A structural solution, scope and indicative or refined quotation are prepared.

    Typically 2–4 weeks

  3. Step 3

    Production preparation

    Structural details, panel marking and logistics are planned before factory production.

    1–2 weeks

  4. Step 4

    Factory manufacturing

    Panels are manufactured at the ZTC factory in Latvia with CNC precision and quality control.

    Manufacturing may begin from approximately two weeks; schedule depends on capacity

  5. Step 5

    Delivery and assembly

    Structures are delivered to site and assembled according to agreed scope.

    Assembly approximately 3–5 days per floor where applicable

  6. Step 6

    Completion according to agreed scope

    Further works depend on the contract scope. ZTC does not prepare architectural drawings or build foundations.

What clients say about the ZTC construction process

Google reviews highlight workmanship quality, communication and support throughout the construction process.

Google review

We are Premium Living AS in Norway and built two houses with this company. We were very satisfied. We sold the last project 2 years ago when I write this review, and the first house was built 4 years ago. With both houses, the production, planning and timing all went smooth and well organised. Right now, all three buyers are pleased, and we haven't received a single complaint about flaws or even blemishes. Even during the Covid lockdowns there was no doubt that our investments and cooperation with ZTC were solid. We recommend, and anyone that has questions can ask ZTC for our reference.

Google review

ZTC built my house in 2012, and they have done some reclamation work in two periods since then. Only positive experiences with ZTC! Good quality of workmanship and customer support.

Google review

Very good experience with all the ZTC staff. Easy to work with, very professional, fast and clear in answering any question during all the projects done. I can only recommend ZTC.

What makes the process more predictable

Factory production

Panels manufactured in the 4,500 m² factory in Latvia.

CNC precision

Hundegger processing at ±1 mm.

Assembly guide

On-site assembly typically planned at approximately 3–5 days per floor.

Warranty

Standard warranty is 3 years, with possible extension to 5 years by agreement.

What ZTC provides and what is planned separately

ZTC provides

  • Timber structural solutions based on the client or architect project.
  • Panel manufacturing in the 4,500 m² factory in Latvia.
  • A CE-marked system with ETA-21/0014 European Technical Assessment.
  • Transport and on-site assembly of the timber structures.

Planned separately

  • ZTC does not prepare architectural drawings.
  • ZTC does not build foundations.
  • External utilities, interior works and building systems must be agreed in the project offer.

Frequently asked questions

Questions about the construction process, payment, foundations and warranty.

After project approval and contract signing, production can usually be scheduled within 1–3 months. Manufacturing starts from around 2 weeks, while an externally finished house is typically completed within 1–2 months depending on scope.

After project approval and contract signing, production can usually be scheduled within 1–3 months. Manufacturing requires at least around 2 weeks. On-site construction depends on the scope of work — an externally finished house is typically completed within 1–2 months. Overall, a house assembled on site is often ready in approximately 4–6 months.

ZTC does not prepare architectural drawings. The company works from a client or architect’s project and provides structural solutions, manufacturing and assembly.

ZTC does not prepare architectural plans. We work from a project prepared by the client or architect and provide engineering/structural design, manufacturing and assembly.

ZTC mainly builds individual projects and respects owners’ privacy. If a project is under construction, a visit may be arranged, and you are always welcome to visit the ZTC factory.

ZTC mainly builds individual projects and respects owners’ privacy. When a project is under construction, a site visit may be arranged. You are always welcome to visit the ZTC factory.

Payments are made in stages: 10% on contract signing, 35% before production, 40% before loading, 10% on completion at site and 5% after the handover certificate.

Payments are made in stages: 10% on contract signing, 35% before production starts (covered by ZTC advance payment guarantee), 40% when production is complete and the loading date is confirmed, 10% on completion at site and 5% after signing the handover certificate (the last two payments are covered by the client’s bank guarantee).

ZTC does not build foundations. Foundation design and construction are the client’s responsibility and depend on ground conditions, but timber structures are lightweight so strip foundations or piles are often suitable.

ZTC does not build foundations — this remains the client’s responsibility. Strip foundations are commonly used, but piles are also possible. The choice depends on ground conditions. Timber structures are lightweight, so several foundation types may be suitable.

ZTC houses are designed for a service life of at least 50 years. The standard warranty is 3 years, but in some cases it may be possible to agree an extension to 5 years.

Houses are designed for a service life of at least 50 years. The standard structural warranty is 3 years. In some cases an extension to 5 years may be considered where supported by material suppliers.

Start with a project review

Send project information, drawings or sketches so ZTC can review the structure, scope, programme and next steps.