Timber frame house cost starts with project review
Cost remains indicative until floor area, architecture, scope, insulation and assembly requirements are known.
ZTC experience and production facts
35+
years of experience
400+
completed projects
14
European countries
±1 mm
CNC precision
Indicative timber frame house prices
Timber frame house cost depends on panel complexity, structural junctions, insulation scope and on-site assembly. The ranges below are indicative and based on ZTC timber frame delivery.
- Timber frame structural package
- €575/m² + VAT at 100–<150 m²; €500/m² + VAT from 150 m². EUR base rates for a simple rectangular Comfort shell.
≈ £480/m² + VAT at 100–<150 m²; £417/m² + VAT from 150 m². GBP equivalents for a simple rectangular Comfort shell.Indicative GBP · ECB rate 5 Nov 2026 · quoted in EUR
- Externally finished timber frame house
- Prices are quoted in EUR. Request a project quote for the agreed specification and scope.
Timber frame solution, factory panel production, transport and assembly.
Structural package with exterior completion according to project scope.
Timber frame structure
Complex spans, large glazing and non-standard junctions increase factory detail scope.
CE and ETA system
CE marking under ETA-21/0014 provides documented product performance for Building Control and warranty submissions.
On-site assembly
Assembly is typically planned at approximately 3–5 days per floor depending on the project.
Scope
A structural package and an externally finished house are different delivery scopes.
ZTC prepares a precise timber frame offer after project review. Price always depends on the specific solution.
Estimate the priceWhat is included in the timber frame package
A ZTC timber frame offer is based on a specific structural solution: factory panel production in Latvia, transport and assembly. Architectural drawings and foundations are outside the ZTC scope. See timber house price for broader context, energy-efficient timber houses for performance impact, or use the calculator.
Cost must be reviewed together with scope
Structural package
Prices are quoted in EUR. Request a project quote for the agreed specification and scope.
Externally finished house
Prices are quoted in EUR. Request a project quote for the agreed specification and scope.
Precise production
CNC precision of ±1 mm supports quality and predictable assembly.
Assembly pace
On-site assembly is typically planned at approximately 3–5 days per floor.
What is usually included in a price offer and what is not
Usually included in the offer
- Timber structural solution based on the client or architect project.
- Panel production in the 4,500 m² factory in Latvia.
- Insulation and membranes according to the selected scope.
- Transport and on-site assembly.
Usually not included
- ZTC does not prepare architectural drawings.
- ZTC does not build foundations.
- External utilities, interior works, HVAC and electrical unless agreed in the offer.
- A precise price is confirmed only after project review.
Estimate your indicative budget
The calculator helps compare scopes and prepare an initial budget guide before project review.
Completed private homes

Private residence
Precision Meets Recognition: Building for an Architect
Gelderland, Netherlands
View project
Private residence
Commitment & Trust – Building Homes Through Challenges
, Sweden
View project
Private residence
Authentic-Style Two-Storey House
Amsterdam, Netherlands
View project
Private residence
Modern Coastal House with Curved Timber Structures
Akershus, Norway
View project
Private residence
Sustainable Engineering: The CLT & SiOO:X Home
Leinster, Ireland
View project-1.jpg&w=1920&q=60)
Private residence
Prefabricated timber frame house
Oslo, Norway
View projectRelated topics
- Timber house priceIndicative timber house price ranges and the factors that influence a ZTC offer for a specific project.
- Timber frame housesTimber frame houses by ZTC: structural solution, factory panel production in Latvia and on-site assembly.
- Energy-efficient timber housesEnergy-efficient timber house solutions with ZTC structures, insulation and airtightness requirements adapted to the project.
- Foundations for a timber frame houseFoundations for a timber frame house and what is ZTC versus client responsibility before structure production.
Frequently asked questions
Questions about timber frame house cost, construction process, foundations and scope levels.
A closed panel shell starts from €500/m² + VAT at 150 m² or more. For 100 m² to less than 150 m², the base shell rate is €575/m² + VAT. These rates assume Comfort panels and a simple rectangular house.
Rates use the gross external floor area across all storeys. The shell includes insulated external wall and roof panels, internal walls, transport and assembly by our crew. The externally finished package adds facade cladding, windows, external doors and roof covering. Foundations, interior finishes, building services and site costs are excluded. Quotes are in EUR; GBP equivalents are indicative. The final price and scope depend on your drawings, specification and site conditions.
Beyond the house price, you should plan for architectural design, approvals, topography, geology, energy certificate, foundations, external utilities, heating, ventilation, interior works and commissioning.
Beyond the house price, you should plan for architectural design, approvals, topographic survey, geology, energy certificate, foundations, external utilities, heating, ventilation, interior works and commissioning.
After project approval and contract signing, production can usually be scheduled within 1–3 months. Manufacturing starts from around 2 weeks, while an externally finished house is typically completed within 1–2 months depending on scope.
After project approval and contract signing, production can usually be scheduled within 1–3 months. Manufacturing requires at least around 2 weeks. On-site construction depends on the scope of work — an externally finished house is typically completed within 1–2 months. Overall, a house assembled on site is often ready in approximately 4–6 months.
ZTC does not prepare architectural drawings. The company works from a client or architect’s project and provides structural solutions, manufacturing and assembly.
ZTC does not prepare architectural plans. We work from a project prepared by the client or architect and provide engineering/structural design, manufacturing and assembly.
ZTC mainly builds individual projects and respects owners’ privacy. If a project is under construction, a visit may be arranged, and you are always welcome to visit the ZTC factory.
ZTC mainly builds individual projects and respects owners’ privacy. When a project is under construction, a site visit may be arranged. You are always welcome to visit the ZTC factory.
ZTC does not build foundations. Foundation design and construction are the client’s responsibility and depend on ground conditions, but timber structures are lightweight so strip foundations or piles are often suitable.
ZTC does not build foundations — this remains the client’s responsibility. Strip foundations are commonly used, but piles are also possible. The choice depends on ground conditions. Timber structures are lightweight, so several foundation types may be suitable.
Grey-stage finishing usually means plasterboard is installed, while painting and floor coverings remain to be completed.
Interior finishing, including fitting plasterboard, is not included in either the ZTC shell or the externally finished package. Arrange this work with your local contractors. The quotation defines the exact division of work; “externally finished” describes the outside of the house, not the interior.
White-stage finishing usually means plasterboard is filled and painted and floor coverings are installed.
This interior finishing is not included in either the ZTC shell or the externally finished package. Your local contractors or project team arrange the interior fit-out and building services. Agree the completion standard and responsibilities in the project specification.
Let us review the cost of your project
Send project information so ZTC can prepare an offer that matches the actual scope.
Three closed panel levels, one fabric first system
Every panel leaves our factory insulated, with a wind barrier on the outside and a vapour control layer on the inside, so only the top edge needs wrapping for transport. Choose the level that fits your energy target and budget. Roof panels use the same build-up as the corresponding external wall panel, with an additional 50 mm of insulation. The U-values below apply to walls only.
Comfort
Cost-efficient mineral wool panel for a well-insulated house.
Wall U-value: 0.167 W/m²K
Outside the panel: Timber board cladding (externally finished package).
In the panel, outside to inside
- Vertical battens 25 × 45 mm
- Wind barrier membrane
- Timber frame 195 × 45 mm with mineral wool insulation
- Vapour control layer (PE membrane)
- Service battens 45 × 45 mm
Added on site after services
- 45 mm mineral wool in the service void
- Plasterboard
Premium
Wood-fibre or cellulose insulated panel with a timber airtightness layer.
Wall U-value: 0.136 W/m²K
In the panel, outside to inside
- Counter battens 25 × 45 mm
- Wind barrier membrane
- Wood-fibre sheathing board 22 mm
- Timber frame 245 × 45 mm with wood-fibre or cellulose insulation
- Airtight vapour control: 15 mm plywood with taped joints
Added on site after services
- Service battens 45 × 45 mm
- 45 mm insulation in the service void
- Plasterboard
Lux
Our most highly insulated standard wall panel for low-energy homes.
Wall U-value: 0.100 W/m²K
In the panel, outside to inside
- Counter battens 25 × 45 mm
- Wind barrier membrane
- STEICO Therm wood-fibre insulation board 40 mm
- Timber frame 340 × 45 mm with wood-fibre or cellulose insulation
- Airtight vapour control: 15 mm plywood with taped joints
Added on site after services
- Service battens 45 × 45 mm
- 45 mm insulation in the service void
- Plasterboard
Closed panel shell
Insulated and weatherproof structure
- Insulated external wall panels, sealed on both faces
- Insulated roof panels based on the corresponding external wall panel, with 50 mm additional insulation
- Load-bearing and non-load-bearing internal walls (timber frame, 12 mm OSB one side)
- Transport to your site
- Assembly by our own crew, including crew travel
Externally finished house
Everything in the shell, plus a completed exterior
- Facade cladding: timber boards, render, brick slips or metal
- Windows with installation, external trims and sills
- External doors with installation
- Roof covering, gutters and downpipes
Starting price
€500/m² + VAT
≈ £417/m² + VATIndicative GBP · ECB rate 5 Nov 2026 · quoted in EUR
Closed panel shell, measured on the gross external floor area. Achievable with:
- Rectangular house with a simple layout
- Comfort panels
- At least 150 m² in total
For 100 m² to less than 150 m², the base shell rate is €575/m² + VAT.
≈ £480/m² + VAT for 100–<150 m²Indicative GBP · ECB rate 5 Nov 2026 · quoted in EUR
Send drawings for a quoteNot included in either scope
- Architectural design
- Foundations and plinth
- Interior finishing, including fitting plasterboard
- Electrics, heating, plumbing and drainage, ventilation
- Crane, scaffolding and site fencing
- Crew accommodation near the site, if needed
More answers on scope, timing and warranties in the timber frame FAQ.