
Prefabricated Timber & CLT Buildings
34 years of experience building sustainable homes and buildings across Europe.
projects completed
across 14 European countries
Timber and CLT solutions for developers, architects and contractors.
Business SolutionsBuilt on a Foundation of Expertise
34 Years Experience
Since 1991, we have delivered 350+ projects across 14 countries — combining decades of expertise with a personal approach to every build.
Timber Frame + CLT
Two advanced building technologies produced in one modern factory. One supplier, one contract, one point of accountability.
CNC Factory Precision
Hundegger CNC manufacturing with ±1mm tolerance. Panels arrive ready to assemble — no on-site adjustments, no waste, no delays.
Fast On-Site Assembly
Structural shell assembled in 3–5 days per floor. Weather-tight in weeks, not months - interior works can start earlier.
Recent Projects
350+ projects in 14 European countries

Privātmāja Nīderlandē
Nīderlande

Family House
Latvia

The Swedish prefab home: overcoming obstacles with ZTC
Sweden

Interesantas arhitektūras privātmāja Nīderlandē
Nīderlande

Residential Complex
Netherlands

Complex timber frame house
Norway

Awards & Recognition
Internationally awarded 10+ times
- 2025
3rd Place - Latvian Construction Annual Award 2025, Timber Building (Office Building, Jelgava)
- 2025
1st Place - Sustainability in Architecture, Construction & Design Baltics, Timber Building
- 2024
3rd Place – Best Building of the Year in Latvia 2024, Timber Building ("Panorama" Private Housing Estate, Norway)
- 2024
3rd Place - Latvian Construction Annual Award 2024, Timber Building ("Panorama" Private House Village, Norway)
- 2023
Commendation – Best Building of the Year in Latvia 2023, Timber Building (Private House, Norway)
- 2021
Jelgava City Highest Honour - Director Māris Avotiņš, Latvia Independence Day
- 2020
Socially Responsible Company Award - Jelgava Region
- 2020
Most Employee-Friendly Company - Jelgava District
- 2019
LBS Diamond Award — Best Building Abroad (Multi-functional building, Nacka, Sweden)
Project Videos
See our timber construction projects come to life - from factory production to on-site assembly.

Private house of architects in the Netherlands
Real client experience - from order to completed structure

Our Factory Video
Factory manufacturing process

Prefabricated House Assembly
On-site installation from panels to weather-tight shell
Two Technologies, One Supplier

Timber Frame Construction
- Insulated wall, floor and roof panels for 1–5 storey residential buildings
- U-value from 0.12 W/m²K — cellulose or wood fibre insulation as standard
- Factory-fitted windows available — panels delivered ready to assemble on site

CLT Structural Systems
- Mass timber structures up to 8 storeys
- 3, 5 or 7 layer configurations — max panel size 13,800 × 3,100 × 400mm
- Fire resistance up to EI 120 — acoustic performance Rw up to 65 dB
Best of Both Worlds
Hybrid Solutions
CLT structural core combined with timber frame insulated envelope delivers 15–20% cost reduction versus pure CLT — with superior thermal performance, one contract, and one point of accountability.
How The Process Works
Project Assessment
Send us your drawings or concept. We assess structural feasibility and provide a preliminary budget range within 10 business days. No cost, no obligation.
Fixed-Price Proposal
Fixed pricing for the entire scope — from production to assembly. Prices are locked upon signing with no escalation clauses and no hidden costs.
Engineering & Production
Production drawings are prepared and your project enters CNC manufacturing. You receive progress updates throughout the production run.
Logistics & Delivery
Panels are loaded in assembly sequence and delivered on schedule. Latvia to most EU destinations in 2–5 days.
On-Site Assembly
ZTC crew assembles the structural shell on site. Weather-tight closure follows immediately — interior works can start weeks earlier than with traditional construction.
Handover & Documentation
As-built drawings, CE certification, warranty certificate and airtightness test results. Full documentation package ready for building inspection.
Projects Across Europe
Active Markets
Estimate Your Timber House Price
Get a quick idea of your house cost in seconds.
Structural Package
€58.000 – €72.000
Exterior-Complete Package
€91.000 – €125.000
Final cost depends on house design, efficiency level and finishing.
