ZTC logo
Industrial Facility Facade with CLT and Infill Panels

LatviaDeveloper project

Industrial Facility Facade with CLT and Infill Panels

Developer
Industrial Facility Facade with CLT and Infill Panels image 1

About this project

Fast and sustainable construction is achievable with infill panel technology. For this project, we manufactured and installed the industrial facility’s front facade using insulated facade panels featuring a 60 mm CLT interior finish. The panels arrived on-site as ready-to-install elements and were mounted onto the steel framework. Parallel processes - manufacturing panels while the steel frame was being erected on-site, it significantly reduced the total construction time. The panels were installed without the need for scaffolding, saving both time and resources. Timber is a natural, renewable material with excellent thermal insulation properties, reducing energy consumption and sequestering CO2. The CLT panels used are durable and feature an easily renewable surface, which is essential for industrial environments. This project serves as proof that timber is an excellent material not only for small-scale buildings but also for large-scale industrial facilities.

Specifications

Area
170
Floors
2
Year completed
2024
Building type
Developer project

Interested in a similar project?

Let's discuss your vision and bring it to life with sustainable timber construction.

Industrial Facility Facade with CLT and Infill Panels — ZTC