Google review
Very good experience with all the ZTC staff. Easy to work with, very professional, fast and clear in answering any question during all the projects done. I can only recommend ZTC.

ZTC manufactures timber frame panels in controlled conditions, ensuring precision, quality control and predictable on-site assembly.
35+
years of experience
400+
completed projects
14
European countries
±1 mm
CNC precision
In timber frame panels, a large part of the structure is prepared in the factory rather than entirely on site. This improves control of insulation, membranes and assembly sequence. Compare with timber frame houses, Hundegger CNC production and price guidance.
The ZTC process starts with a client or architect project. Production happens in the factory, but the final solution always depends on the specific project.
1.
ZTC develops the timber structural solution based on the client or architect project.
2.
Structural elements are prepared with Hundegger CNC precision of ±1 mm.
3.
Panels are assembled in controlled factory conditions.
4.
Insulation and membranes are installed according to the selected scope.
5.
Panels are delivered to site and assembled in the agreed work sequence.
Google reviews highlight ZTC’s precision, organised process and professional communication.
Google review
Very good experience with all the ZTC staff. Easy to work with, very professional, fast and clear in answering any question during all the projects done. I can only recommend ZTC.
Hundegger CNC processing with ±1 mm precision.
Panels are assembled in a 4,500 m² factory in Latvia.
Typically around 3–5 days per floor depending on the project.
Finished panels are delivered to site in a coordinated sequence.
The calculator helps compare scopes and prepare an initial budget guide before project review.

Private residence
Gelderland, Netherlands
View project
Private residence
, Sweden
View project
Private residence
Amsterdam, Netherlands
View project
Private residence
Akershus, Norway
View project
Private residence
Leinster, Ireland
View project-1.jpg&w=1920&q=60)
Private residence
Oslo, Norway
View projectQuestions about panel technology, construction process and energy performance.
ZTC uses mineral wool, cellulose insulation and wood fibre insulation. The company has an industrial Isofloc system for blowing cellulose and wood fibre insulation.
ZTC uses mineral wool, cellulose insulation and wood fibre insulation. The company operates an industrial Isofloc system for blowing cellulose and wood fibre insulation.
Panels are connected with long screws or special timber connectors. A wind barrier is used externally, a vapour control layer internally, and membranes are carefully taped across the building.
Panels are connected with long screws or special timber connectors. A wind barrier is used externally and a vapour control layer internally, with membranes carefully taped across the building.
Airborne sound insulation in timber houses can be very good, especially with cellulose or wood fibre. Impact sound in intermediate floors should be addressed with appropriate floor and ceiling solutions.
Airborne sound performance in timber houses can be very good. Impact sound in intermediate floors is addressed with appropriate floor and ceiling solutions.
For houses up to around 3 storeys, timber frame is often more economical. CLT may suit load-bearing structures, hybrid solutions or where exposed solid timber walls are desired.
For houses up to around 3 storeys, timber frame is often more economical. CLT may suit load-bearing structures, hybrid solutions or exposed solid timber walls.
After project approval and contract signing, production can usually be scheduled within 1–3 months. Manufacturing starts from around 2 weeks, while an externally finished house is typically completed within 1–2 months depending on scope.
After project approval and contract signing, production can usually be scheduled within 1–3 months. Manufacturing requires at least around 2 weeks. On-site construction depends on the scope of work — an externally finished house is typically completed within 1–2 months. Overall, a house assembled on site is often ready in approximately 4–6 months.
ZTC does not prepare architectural drawings. The company works from a client or architect’s project and provides structural solutions, manufacturing and assembly.
ZTC does not prepare architectural plans. We work from a project prepared by the client or architect and provide engineering/structural design, manufacturing and assembly.
ZTC mainly builds individual projects and respects owners’ privacy. If a project is under construction, a visit may be arranged, and you are always welcome to visit the ZTC factory.
ZTC mainly builds individual projects and respects owners’ privacy. When a project is under construction, a site visit may be arranged. You are always welcome to visit the ZTC factory.
Standard wall U-values are Comfort 0.167, Premium 0.136 and Lux 0.100 W/m²K.
The specified U-value depends on the complete wall build-up agreed for the project, including layers installed on site. Whole-building energy performance also depends on windows, junctions, airtightness and building services. Your design team coordinates these with the project’s energy assessor.
The n50 value describes building airtightness. In quality constructions it is possible to achieve n50 below 0.6, which is important for energy-efficient buildings.
The final EPC rating depends on the complete building specification and is determined by an accredited assessor for the project.
Insulation, windows, airtightness, heating, ventilation and renewables all affect the result. The project’s accredited assessor determines the final EPC rating from the full specification. ZTC panels can support the agreed energy target, but a structural package alone cannot guarantee an EPC rating. Your design team should coordinate the full specification with the assessor.
Energy calculations are prepared during the design stage, before the panel specifications are finalised, and updated for the completed building.
The client or design team appoints a qualified assessor. Agree responsibility early so the calculations can guide the insulation, windows, airtightness, heating, ventilation and any renewables before manufacture.
Yes. ZTC manufactures timber frame panels in Latvia and provides transport and on-site assembly in the UK according to the agreed project scope. Your local architect or project team is responsible for architectural drawings, approvals, foundations and site readiness. The offer sets out the exact division of work.
Contact ZTC to discuss structure, scope and production options.
Every panel leaves our factory insulated, with a wind barrier on the outside and a vapour control layer on the inside, so only the top edge needs wrapping for transport. Choose the level that fits your energy target and budget. Roof panels use the same build-up as the corresponding external wall panel, with an additional 50 mm of insulation. The U-values below apply to walls only.
Cost-efficient mineral wool panel for a well-insulated house.
Wall U-value: 0.167 W/m²K
Outside the panel: Timber board cladding (externally finished package).
In the panel, outside to inside
Added on site after services
Wood-fibre or cellulose insulated panel with a timber airtightness layer.
Wall U-value: 0.136 W/m²K
In the panel, outside to inside
Added on site after services
Our most highly insulated standard wall panel for low-energy homes.
Wall U-value: 0.100 W/m²K
In the panel, outside to inside
Added on site after services
Insulated and weatherproof structure
Everything in the shell, plus a completed exterior
Starting price
€500/m² + VAT
≈ £417/m² + VATIndicative GBP · ECB rate 5 Nov 2026 · quoted in EUR
Closed panel shell, measured on the gross external floor area. Achievable with:
For 100 m² to less than 150 m², the base shell rate is €575/m² + VAT.
≈ £480/m² + VAT for 100–<150 m²Indicative GBP · ECB rate 5 Nov 2026 · quoted in EUR
Send drawings for a quoteNot included in either scope
More answers on scope, timing and warranties in the timber frame FAQ.