CNC processing in the factory delivers precise elements that reduce on-site corrections and support predictable assembly.

ZTC experience and production facts

35+

years of experience

400+

completed projects

14

European countries

±1 mm

CNC precision

Why factory precision matters on site

±1 mm precision helps panels and junctions fit predictably on site. This reduces rework risk and supports assembly quality. See timber frame panels, CLT panels and certified structures.

Factory and CNC parameters

CNC precision

±1 mm

Factory

4,500 m²

Capacity

30,000 m² of panels per year

Assembly

3–5 days per floor

What precise production delivers

Fewer corrections

Precise elements reduce the need to adjust assembly on site.

Predictable assembly

Assembly typically around 3–5 days per floor depending on the project.

Quality control

Production takes place in controlled factory conditions.

Export projects

ZTC experience across 14 European countries with a factory in Latvia.

Frequently asked questions

Questions about CNC production, technologies and warranty.

ZTC uses mineral wool, cellulose insulation and wood fibre insulation. The company has an industrial Isofloc system for blowing cellulose and wood fibre insulation.

ZTC uses mineral wool, cellulose insulation and wood fibre insulation. The company operates an industrial Isofloc system for blowing cellulose and wood fibre insulation.

Panels are connected with long screws or special timber connectors. A wind barrier is used externally, a vapour control layer internally, and membranes are carefully taped across the building.

Panels are connected with long screws or special timber connectors. A wind barrier is used externally and a vapour control layer internally, with membranes carefully taped across the building.

Airborne sound insulation in timber houses can be very good, especially with cellulose or wood fibre. Impact sound in intermediate floors should be addressed with appropriate floor and ceiling solutions.

Airborne sound performance in timber houses can be very good. Impact sound in intermediate floors is addressed with appropriate floor and ceiling solutions.

For houses up to around 3 storeys, timber frame is often more economical. CLT may suit load-bearing structures, hybrid solutions or where exposed solid timber walls are desired.

For houses up to around 3 storeys, timber frame is often more economical. CLT may suit load-bearing structures, hybrid solutions or exposed solid timber walls.

After project approval and contract signing, production can usually be scheduled within 1–3 months. Manufacturing starts from around 2 weeks, while an externally finished house is typically completed within 1–2 months depending on scope.

After project approval and contract signing, production can usually be scheduled within 1–3 months. Manufacturing requires at least around 2 weeks. On-site construction depends on the scope of work — an externally finished house is typically completed within 1–2 months. Overall, a house assembled on site is often ready in approximately 4–6 months.

ZTC does not prepare architectural drawings. The company works from a client or architect’s project and provides structural solutions, manufacturing and assembly.

ZTC does not prepare architectural plans. We work from a project prepared by the client or architect and provide engineering/structural design, manufacturing and assembly.

ZTC mainly builds individual projects and respects owners’ privacy. If a project is under construction, a visit may be arranged, and you are always welcome to visit the ZTC factory.

ZTC mainly builds individual projects and respects owners’ privacy. When a project is under construction, a site visit may be arranged. You are always welcome to visit the ZTC factory.

ZTC houses are designed for a service life of at least 50 years. The standard warranty is 3 years, but in some cases it may be possible to agree an extension to 5 years.

Houses are designed for a service life of at least 50 years. The standard structural warranty is 3 years. In some cases an extension to 5 years may be considered where supported by material suppliers.