ZTC Logo
Timber engineering and manufacturing support for architects
For architects

Timber engineering and manufacturing support for architects

Technical coordination for timber frame, CLT, hybrid and infill façade systems — without architectural design production by ZTC.

ZTC experience and production facts

35+

years of experience

400+

completed projects

14

European countries

±1 mm

CNC precision

Systems available

ZTC supplies timber frame panels, CLT structural solutions, hybrid systems and infill façade panels. See CE/ETA certification, Hundegger CNC production and CLT panels. Contact us via contact.

Technical coordination workflow

ZTC does not produce the architectural design. The structural and manufacturing solution is coordinated with the client’s architect and project team.

  1. 1.

    System selection

    Timber frame, CLT, hybrid or infill façade solutions are reviewed together with the architect.

  2. 2.

    Interface definition

    Openings, service penetrations, fire and acoustic requirements are coordinated.

  3. 3.

    Production preparation

    Structural dimensions, tolerances and lifting constraints are fixed before manufacturing.

  4. 4.

    Manufacturing and delivery

    Elements are factory-produced with CE marking and delivered to site.

  5. 5.

    Assembly and handover

    Assembly follows the project sequence and agreed scope.

Information required from the architect

Coordination points

  • Architectural plans and building geometry.
  • Openings, façade design and visible timber finishes.
  • Fire and acoustic requirements.
  • Transport and assembly sequence constraints.

What ZTC does not produce

  • Architectural design development.
  • Foundation and MEP engineering.
  • Local building permit procurement.
  • Universal compliance with every European building regulation.

Certification and production precision

CE and ETA-21/0014

European Technical Assessment for structural systems.

±1 mm CNC

Hundegger processing precision in Vītoliņi.

FSC and PEFC

Available on request.

Established in 1991

400+ completed projects in 14 European countries.

Frequently asked questions

Answers about technologies, energy performance, construction process and comparisons.

ZTC uses mineral wool, cellulose insulation and wood fibre insulation. The company has an industrial Isofloc system for blowing cellulose and wood fibre insulation.

ZTC uses mineral wool, cellulose insulation and wood fibre insulation. The company operates an industrial Isofloc system for blowing cellulose and wood fibre insulation.

Panels are connected with long screws or special timber connectors. A wind barrier is used externally, a vapour control layer internally, and membranes are carefully taped across the building.

Panels are connected with long screws or special timber connectors. A wind barrier is used externally and a vapour control layer internally, with membranes carefully taped across the building.

Airborne sound insulation in timber houses can be very good, especially with cellulose or wood fibre. Impact sound in intermediate floors should be addressed with appropriate floor and ceiling solutions.

Airborne sound performance in timber houses can be very good. Impact sound in intermediate floors is addressed with appropriate floor and ceiling solutions.

For houses up to around 3 storeys, timber frame is often more economical. CLT may suit load-bearing structures, hybrid solutions or where exposed solid timber walls are desired.

For houses up to around 3 storeys, timber frame is often more economical. CLT may suit load-bearing structures, hybrid solutions or exposed solid timber walls.

Standard wall U-values are Comfort 0.167, Premium 0.136 and Lux 0.100 W/m²K.

The specified U-value depends on the complete wall build-up agreed for the project, including layers installed on site. Whole-building energy performance also depends on windows, junctions, airtightness and building services. Your design team coordinates these with the project’s energy assessor.

The n50 value describes building airtightness. In quality constructions it is possible to achieve n50 below 0.6, which is important for energy-efficient buildings.

The final EPC rating depends on the complete building specification and is determined by an accredited assessor for the project.

Insulation, windows, airtightness, heating, ventilation and renewables all affect the result. The project’s accredited assessor determines the final EPC rating from the full specification. ZTC panels can support the agreed energy target, but a structural package alone cannot guarantee an EPC rating. Your design team should coordinate the full specification with the assessor.

Energy calculations are prepared during the design stage, before the panel specifications are finalised, and updated for the completed building.

The client or design team appoints a qualified assessor. Agree responsibility early so the calculations can guide the insulation, windows, airtightness, heating, ventilation and any renewables before manufacture.

Yes. ZTC manufactures timber frame panels in Latvia and provides transport and on-site assembly in the UK according to the agreed project scope. Your local architect or project team is responsible for architectural drawings, approvals, foundations and site readiness. The offer sets out the exact division of work.

After project approval and contract signing, production can usually be scheduled within 1–3 months. Manufacturing starts from around 2 weeks, while an externally finished house is typically completed within 1–2 months depending on scope.

After project approval and contract signing, production can usually be scheduled within 1–3 months. Manufacturing requires at least around 2 weeks. On-site construction depends on the scope of work — an externally finished house is typically completed within 1–2 months. Overall, a house assembled on site is often ready in approximately 4–6 months.

ZTC does not prepare architectural drawings. The company works from a client or architect’s project and provides structural solutions, manufacturing and assembly.

ZTC does not prepare architectural plans. We work from a project prepared by the client or architect and provide engineering/structural design, manufacturing and assembly.

ZTC mainly builds individual projects and respects owners’ privacy. If a project is under construction, a visit may be arranged, and you are always welcome to visit the ZTC factory.

ZTC mainly builds individual projects and respects owners’ privacy. When a project is under construction, a site visit may be arranged. You are always welcome to visit the ZTC factory.

ZTC manufactures and assembles houses itself, has experience since 1991, CE and ETA-21/0014 certification, Hundegger CNC precision of ±1 mm and an industrial insulation installation system.

ZTC manufactures and assembles houses itself. The company has experience since 1991, CE marking and ETA-21/0014, Hundegger CNC precision of ±1 mm and an industrial Isofloc insulation system.

What partners say about technical collaboration

Google reviews highlight precision, communication and quality delivery on technically demanding projects.

Google review

We are Premium Living AS in Norway and built two houses with this company. We were very satisfied. We sold the last project 2 years ago when I write this review, and the first house was built 4 years ago. With both houses, the production, planning and timing all went smooth and well organised. Right now, all three buyers are pleased, and we haven't received a single complaint about flaws or even blemishes. Even during the Covid lockdowns there was no doubt that our investments and cooperation with ZTC were solid. We recommend, and anyone that has questions can ask ZTC for our reference.

Google review

Very good experience with all the ZTC staff. Easy to work with, very professional, fast and clear in answering any question during all the projects done. I can only recommend ZTC.

Start with technical coordination

Send architectural plans and requirements so ZTC can review the structural and manufacturing solution.