ZTC Logo
Prefabricated timber houses for European projects
European export

Prefabricated timber houses for European projects

ZTC manufactures certified timber building systems in Latvia for private, residential and development projects across Europe.

ZTC experience and production facts

35+

years of experience

400+

completed projects

14

European countries

±1 mm

CNC precision

Export experience across Europe

ZTC has completed projects in 14 European countries. The company supplies timber frame, CLT and hybrid building systems manufactured in Latvia — with technical documentation, CE marking and ETA-21/0014 certification. Project requirements are coordinated with the client’s local architect, engineer and approval process. The final construction solution depends on the project documentation and local requirements.

How cross-border cooperation works

ZTC has delivered timber building systems in 14 European countries. Each export project is coordinated individually — requirements are aligned with the client’s local architect, engineer and approval process.

  1. 1.

    Project review

    ZTC reviews project documentation, scope, delivery expectations and technical requirements.

  2. 2.

    Technical coordination

    Structural details are coordinated with the client’s design team and local engineering partners.

  3. 3.

    Production planning

    Manufacturing sequence, panel marking and logistics are planned before factory production starts.

  4. 4.

    Factory manufacturing

    Panels and structural elements are produced in Latvia with CNC precision and quality control.

  5. 5.

    Transport coordination

    Delivery is organised according to the agreed scope. Transport costs and timing depend on the project.

  6. 6.

    Assembly on site

    On-site assembly is carried out according to the agreed scope — typically around 3–5 days per floor.

What ZTC supplies for European projects

14 countries

Export experience across European markets.

Factory production

4,500 m² factory with up to 30,000 m² panels per year.

Certified systems

CE marking and ETA-21/0014 European Technical Assessment.

Hybrid systems

Timber frame, CLT and infill façade panel solutions.

What ZTC supplies and what is coordinated locally

ZTC typically supplies

  • Timber frame, CLT and hybrid structural systems manufactured in Latvia.
  • Factory production with CE marking and ETA-21/0014 documentation.
  • Technical coordination with the client’s design team.
  • Transport and on-site assembly according to agreed scope.

Coordinated locally by the client

  • Local building permits and regulatory approvals.
  • Architectural drawings unless agreed in scope.
  • Foundations, utilities and interior finishing.
  • Universal delivery times or transport prices without project review.

What European clients say about ZTC delivery

Google reviews highlight export project coordination, manufacturing quality and reliable cooperation across borders.

Google review

We are Premium Living AS in Norway and built two houses with this company. We were very satisfied. We sold the last project 2 years ago when I write this review, and the first house was built 4 years ago. With both houses, the production, planning and timing all went smooth and well organised. Right now, all three buyers are pleased, and we haven't received a single complaint about flaws or even blemishes. Even during the Covid lockdowns there was no doubt that our investments and cooperation with ZTC were solid. We recommend, and anyone that has questions can ask ZTC for our reference.

Frequently asked questions

Answers about technologies, cross-border process, warranty and payment terms for export projects.

ZTC uses mineral wool, cellulose insulation and wood fibre insulation. The company has an industrial Isofloc system for blowing cellulose and wood fibre insulation.

ZTC uses mineral wool, cellulose insulation and wood fibre insulation. The company operates an industrial Isofloc system for blowing cellulose and wood fibre insulation.

Panels are connected with long screws or special timber connectors. A wind barrier is used externally, a vapour control layer internally, and membranes are carefully taped across the building.

Panels are connected with long screws or special timber connectors. A wind barrier is used externally and a vapour control layer internally, with membranes carefully taped across the building.

Airborne sound insulation in timber houses can be very good, especially with cellulose or wood fibre. Impact sound in intermediate floors should be addressed with appropriate floor and ceiling solutions.

Airborne sound performance in timber houses can be very good. Impact sound in intermediate floors is addressed with appropriate floor and ceiling solutions.

For houses up to around 3 storeys, timber frame is often more economical. CLT may suit load-bearing structures, hybrid solutions or where exposed solid timber walls are desired.

For houses up to around 3 storeys, timber frame is often more economical. CLT may suit load-bearing structures, hybrid solutions or exposed solid timber walls.

After project approval and contract signing, production can usually be scheduled within 1–3 months. Manufacturing starts from around 2 weeks, while an externally finished house is typically completed within 1–2 months depending on scope.

After project approval and contract signing, production can usually be scheduled within 1–3 months. Manufacturing requires at least around 2 weeks. On-site construction depends on the scope of work — an externally finished house is typically completed within 1–2 months. Overall, a house assembled on site is often ready in approximately 4–6 months.

ZTC does not prepare architectural drawings. The company works from a client or architect’s project and provides structural solutions, manufacturing and assembly.

ZTC does not prepare architectural plans. We work from a project prepared by the client or architect and provide engineering/structural design, manufacturing and assembly.

ZTC mainly builds individual projects and respects owners’ privacy. If a project is under construction, a visit may be arranged, and you are always welcome to visit the ZTC factory.

ZTC mainly builds individual projects and respects owners’ privacy. When a project is under construction, a site visit may be arranged. You are always welcome to visit the ZTC factory.

ZTC houses are designed for a service life of at least 50 years. The standard warranty is 3 years, but in some cases it may be possible to agree an extension to 5 years.

Houses are designed for a service life of at least 50 years. The standard structural warranty is 3 years. In some cases an extension to 5 years may be considered where supported by material suppliers.

ZTC manufactures and assembles houses itself, has experience since 1991, CE and ETA-21/0014 certification, Hundegger CNC precision of ±1 mm and an industrial insulation installation system.

ZTC manufactures and assembles houses itself. The company has experience since 1991, CE marking and ETA-21/0014, Hundegger CNC precision of ±1 mm and an industrial Isofloc insulation system.

Planning a prefabricated timber project in Europe?

Send project information to review scope, technical coordination and manufacturing options.